Sub-Roofing Systems

Stadiums and entertainment venues are often multilevel concrete structures with multiple expansion and control joints. These joints help the building expand and contract as the building moves over time without causing cracks or failures in the materials. While the joints protect the overall structural components, the sealants in the joints typically only last three to five years. When they fail, the joints allow moisture and spilled liquids to flow between decks and leak onto whatever is below.

In most venues this could include suites, kitchens, concessions, locker rooms, service areas, office space, corridors, electrical/data rooms and janitorial facilities. Often times, the owner does not choose to re-caulk all joints in a stadium at the time of failure. This, in addition to weathered traffic coatings and cracks in the concrete, can lead to water leaks. A sub-roofing system can be the solution. They consist of metal roofing suspended beneath upper deck areas to direct any moisture and liquids to a gutter that drains to a storm system.

INSTALLATION OF A SUB-ROOF

Sub-roofing systems are specialty engineered metal panels suspended by rods anchored to the underside of structural members. The sub-roofs are designed to be installed before mechanical, electric, plumbing (MEP), which dictates the weight requirements and anchor pattern in which the rods will be hung, specified by a licensed engineer. The final step is performing a water test to make sure the stystem functions as designed.

As the building settles, it is occasionally necessary to adjust the metal panels in the sub-roof systems. The structure is designed for movement, and stadium/entertainment venues have large amounts of pedestrian traffic on the structure at once sometimes causing significant movement. The sub-roof adjustment is easily done by changing the height of the panels on the rods and usually only has to be done once. After installation, the system is connected to the designed drain system. 

sub-roofing systems, structural roofing 1 systems and sub roofing material
sub-roofing systems, structural roofing 2 systems and sub roofing material
sub-roofing systems, structural roofing systems and sub roofing material 3

SUB-ROOFING LESSONS LEARNED

Chamberlin has extensive experience with sub-roof systems and their applications. We are capable of assisting the design team professionals by determining the proper means and methods of install in a new construction project. Then our team will fully execute the installation while coordinating with the many other trades involved. Since some MEP equipment will need to be suspended below the metal roof, proactive planning and a deep understanding of how the system works is critical to the installation and proper functionality. 

We are proud to be one of only a few companies in the United States who installs sub-roofing systems. Our team has hands-on experience and training in this specific type of system that can be a real game changer for stadium and entertainment venues.

What Our Customers are Saying

We had just come thru Hurricane Harvey and although there were many calls throughout the city they were prompt in their response.

Patricia Langlinais  - Project Manager J Beard Real Estate

The field and office team were always very helpful and responsive to our needs. We appre

Jonathan De La Cruz  - Project Manager Arch-Con Corporation

Great team and quality work.

Colby Hilton  - Project Manager Vaughn Construction

Hallmark was again extremely pleased with the finished product. The Chamberlin team we worked with was courteous, professional and offered solutions for making the project successful. As always with Chamberlin, world-class work.

Joel Smith  - President JPS Consulting

This was a small roofing scope on an existing roof. I had concerns of timeliness to respond since it was so small and not already on the service department’s radar. None of these were issues. Base scope was executed on time without any issue, and anytime I needed help investigating a leak the team quickly responded same day without complaint. Couldn’t be happier with the way this project went.

Derek Rees  - Superintendent DPR Construction

Contact Us Today