St. Francis TEC Expansion

Tulsa, Oklahoma


St. Francis TEC Expansion

Service Type:New Construction Waterproofing

Scope:Below‐grade Grace Bituthene 3000 sheet waterproofing (35,000 square feet), Henry 790‐11 System hot fluid waterproofing on three green roofs and multiple planters (25,000 square feet), Installation of Wasau pavers on three green roofs (21,000 square feet), Xypex crystalline waterproofing on elevator pits (3,000 square feet), Grace Perm‐A‐Barrier VP spray‐applied air barrier (30,000 square feet), Hilti fireproofing (8,000 square feet), Dow 795 joint sealants (20,000 linear feet), Through-wall metal flashing at all metal panels and around windows (7,500 linear feet)

Description:

Safety is a top priority at Chamberlin. Our swing stage used for the joint sealant scope was inspected daily by a competent person, along with the tie lines and tie backs. Each employee working on the stage wore a safety line and tethered their tools and hard hats. A competent person ran the hot fluid waterproofing kettle and a fire watch was conducted each day after work ended. Appropriate Personal Protective Equipment (PPE) for each scope was worn at all times. Full‐time Chamberlin safety professionals conducted frequent jobsite inspections. The project was completed with zero incidents. Chamberlin was honored to receive the 2014 Build Oklahoma Award for their hard work on Saint Francis. 

Chamberlin University

 

 

Category:Healthcare

Owner:St. Francis Health System

Architect:Frankfurt | Short | Bruza

General Contractor:Chamberlin Roofing & Waterproofing

Contract Amount:$1,000,000

Get in Touch with Us Today!