Projects Featured in the News

By Steve Lackmeyer, NewsOK
Chamberlin Scope of Work:  Slab waterproofing, vertical waterproofing, split slab waterproofing, blindside waterproofing, hot fluid-applied waterproofing, traffic coating, expansion joints, water repellents, joint sealants, façade sealants, fire resistive joint sealants, deck coating and garden roof assembly
Owner: Devon Energy
Architect: Kendall/Heaton Associates, Inc.
General Contractor: Flintco/Holder, A Joint Venture
 
 
By ICRI Concrete Repair Bulletin
Chamberlin Scope of Work: Bentonite waterproofing, joint sealants, traffic coating, paint coating and concrete restoration
Contract Amount: $550,000 (approx.)
Owner: City of Dallas Park & Recreation Department
Architect: Quimby McCoy Preservation Architecture, LLP
General Contractor: Rogers O’Brien
 
 
By FiberTite Project Profiles
Chamberlin Scope of Work: Removal of existing roof system and installation of single-ply roofing system and sheet metal
Contract Amount: $2,400,000 (approx.)
Architect: PGAL
General Contractor: Clark Construction
 
 
Great Hills Baptist Church
By Professional Roofing Magazine
Chamberlin Scope of Work: Remove existing standing seam metal roofing and install new standing seam system; new metal wall, fascia and soffit panels; fully adhered TPO roofing system; sheet metal copings, gutters, downspouts and flashing; cut out EIFS and reflash windows; cut out and recaulk EIFS joints; elastomeric coating; drywall repair
Contract Amount: $1,200,000 (approx.)
Consultant: Austech Roof Consultants,
General Contractor: Chamberlin Roofing & Waterproofing
 
 
By Amy Pagett, Building of America
Chamberlin Scope of Work: Modified Bitumen roofing system and sheet metal, below-grade waterproofing, air and vapor barrier, sheet metal flashing and trim, joint sealants, traffic coating, water repellents, through-wall flashing, sheet membrane flashing
Contract Amount: $500,000 (approx.)
Architect: Powers Brown Architecture
General Contractor: Rosenberger Construction LP
Consultant: Curtainwall Design Consultants
 
 
Baker Hughes Research Center Emphasizes Deep Thinking
By BRETT CLANTON, Houston Chronicle
Chamberlin Scope of Work:Tiltwall joint sealants, site paving, joint sealants
Contract Amount: $34,000 (approx.)
Architect: Kirksey
General Contractor: Benchmark Houston Builders, LP